Skip to content
PROOF // Precision & Medical Contract Manufacturing Multi-site precision contract manufacturer · ISO 13485 & FDA-regulated · hybrid Toyota Production System
← All Proof

CHAPTER 04 · TEAM VIEW

One System, a View Built for Each Role

What each role sees on day one. Same shift data, a different lens for each. Click a role to switch.


WHAT EACH ROLE SEES ON DAY ONE

WHAT AGENTS HANDLED FOR YOU TODAY

DATA VIEW

4

Shift reports generated

9

Coaching asks accepted

6

Document callouts flagged

3

Cross-shift notes carried forward

The huddle used to be rebuilt from memory every morning. Now it opens with the numbers already there.

3 items need your judgment

High Q-041

Recurring cell fault matches a lubrication-class issue seen before

Coaching ask ready to accept or send back

Medium Q-042

Scan confidence 68% on an inspection callout

Reviewer sign-off required before it's logged

Medium Q-043

Cell-balance suggestion: shift a job to reduce a cycle-time gap

Awaiting floor-lead approval

THE FULL REPORT

A Full Day's Report

We feed the agent your company's own goals and priorities — not just floor data — so the report reads like it was written by someone who knows what leadership cares about this quarter.

Daily Huddle & Gemba Report

Plant 1 — Machining · Shift 2, Tuesday · Auto-generated 5:52 AM · Reviewed by Floor Lead 6:04 AM

DATA VIEW

Headline Metrics

The same core metrics on every report, every day.

OEE

81%

Target 85%

+2 pts vs. last week

Downtime

2.4 hrs

Target < 2.0 hrs/wk

+0.3 hrs — Cell 13 driven

Scrap Rate

0.6%

Target < 0.8%

On target

FPY

98.1%

Target 97.5%

+0.3 pts

Executive Summary

All four monitored cells reported on time. Cell 13's downtime trend and a soft GD&T scan are the two items that need a decision before shift change — everything else is inside normal range, including the front-office signals below. Nothing here needs an escalation before the 7:00 AM huddle.

4 / 4

Cells reporting

3

Open items

0

Escalations

Normal

Front-office signals

Aligned to Your Strategic Priorities

Protect gross margin — the site's #1 goal this year

Every item below is ranked by margin impact, not just downtime minutes.

Capture tribal knowledge before it retires with the floor's veterans

Today's Cell 7 note gets written back into the shared knowledge base, not just one operator's memory.

Make the productivity jump repeatable, not a mystery

Every accepted ask is logged against a metric, so an improvement can be traced to a cause instead of a guess.

Floor Strategy

Every issue, broken the same way every time — what happened, why, and what to do about it.

Cell 7 — Tool Life

MOVES DOWNTIME Protect gross margin

SIGNAL

3 consecutive early tool replacements overnight, 11:00 PM–5:30 AM.

INSIGHT

Matches a lubrication-class pattern from 14 months of Cell 7 history — not tool wear. Same root cause as March 2024.

ASK

Confirm the lubrication fix with the operator on shift before first shift change.

Source: Cell 7 vibration + tool-change log

Cell 9 — Fixture Alignment

MOVES FPY Make the productivity jump repeatable, not a mystery

SIGNAL

One operator's cycle time on the GD&T-critical bore is running 4% above standard.

INSIGHT

Matches a fixture-alignment issue documented twice before — a setup pattern, not a skill gap.

ASK

Attach the fixture-check coaching note for the floor lead's next check-in, before FPY drifts.

Source: Cell 9 cycle-time vs. standard, last 10 shifts

Cell 13 — Chip Evacuation

MOVES DOWNTIME Protect gross margin

SIGNAL

Downtime climbing three days straight: +9, +14, +22 minutes.

INSIGHT

Three days out from the threshold where this stops being a note and becomes a line stoppage.

ASK

Sign off WO-2291 today — the fix is cheap now, expensive after it compounds.

Source: Cell 13 downtime log, trailing 3 days

Inspection Callout — Part XZ-450B

MOVES SCRAP RATE Protect gross margin

SIGNAL

Positional-tolerance extraction confidence at 68%, below the 85% auto-log threshold.

INSIGHT

Low-confidence extractions are exactly the case the threshold exists for — auto-logging this one risks a mis-recorded tolerance downstream.

ASK

Route to Quality for a 2-minute manual check before the part ships.

Source: GD&T extraction, page 1 of inspection report

Everything monitored, at a glance

Cell 4

5-axis setup · 38 min setup

On target

Cell 7

Tool life · 3 early changes

Watch

Cell 9

Ti-medical FPY · 98.1%

On target

Cell 13

Chip evacuation · +22 min, day 3

Action needed

Front-Office Signals

The report doesn't stop at the floor — same daily cadence, further up the business.

Bar-stock PPV

+1.2% vs. standard

Inside normal range.

Insert consignment level

6.4 days on hand

Slightly below the 7-day target — flagged for procurement, not urgent.

WIP / working capital

$1.84M

Trending flat week over week.

How This Compares

Metric This operation Peer benchmark Source
First-pass yield (Ti-medical) 98.1% 96.8% NIST MEP precision-machining cohort
Unplanned downtime / week 2.4 hrs 3.1 hrs BLS machining-sector median

Recommended Actions Today

Floor Lead Confirm or escalate the Cell 7 coaching ask
Before 7:00 AM huddle
Quality 2-minute manual check on the low-confidence inspection callout
Before the part ships
Maintenance Sign off WO-2291 for Cell 13 chip-evac
Today
Procurement Review insert consignment level against the 7-day target
This week

Every line above cites its source — a specific log, work order, or benchmark table, not a summary of a summary. If we can't show where a number came from, we consider that a bug.

CHAPTER 04 OF 5

UP NEXT · RUN & IMPROVE

See the before-and-after numbers — and what this really changed for the business.

Continue to Run & Improve