Skip to content
PROOF // Utility & Critical Infrastructure Operations Regional electric utility · generation + transmission assets · NERC-regulated · 24/7 control room operations
← All Proof

CHAPTER 04 · TEAM VIEW

One System, a View Built for Each Role

What each role sees on day one. Same grid data, a different lens for each. Click a role to switch.


WHAT EACH ROLE SEES ON DAY ONE

WHAT AGENTS HANDLED FOR YOU TODAY

DATA VIEW

7

Anomalies explained

6

Confirmations accepted

1

Escalations sent up

2

Shift-handoff notes carried forward

Anomalies used to take ten minutes to explain across three screens. Now the explanation is already there when the alarm fires.

2 items need your judgment

High A-118

Unit 4 output deviation matches a compressor-fouling pattern seen before

Confirmation ready to accept or escalate

Medium A-119

Unit 3 startup-cycle count trending above plan

Engineering review requested

THE FULL REPORT

A Full Day's Report

We feed the agent your company's own goals and priorities — not just floor data — so the report reads like it was written by someone who knows what leadership cares about this quarter.

Grid Anomaly Monitoring & Explanation Report

Region 2 — Balancing Authority · Shift 2, Tuesday · Auto-generated 6:10 AM · Reviewed by Shift Supervisor 6:22 AM

DATA VIEW

Headline Metrics

The same core metrics on every report, every day.

Anomaly Response Time

90 sec

Target < 2 min

-40% vs. last week

Anomalies Explained

96%

Target 90%

+4 pts

Generation Availability

97.8%

Target 97%

On target

Compliance Findings

0

Target 0

Clean, 6 weeks running

Executive Summary

All three regions reported on time. Unit 4's output deviation and Unit 3's startup-cycle count are the two items that need a decision before shift end — everything else is inside normal range. Nothing here needs an escalation before the 7:00 AM handoff.

3 / 3

Regions reporting

2

Open items

0

Escalations

Clean

Compliance status

Aligned to Your Strategic Priorities

Protect grid reliability — the region's #1 mandate

Every item below is ranked by reliability impact, not just alarm severity.

Stay ahead of NERC compliance exposure

Every anomaly gets a documented explanation the moment it's confirmed, not reconstructed after the fact.

Close the two-person bottleneck on anomaly interpretation

Every operator on shift gets the same explanation quality the two most experienced people used to provide alone.

Floor Strategy

Every issue, broken the same way every time — what happened, why, and what to do about it.

Unit 4 — Output Deviation

MOVES GENERATION AVAILABILITY Protect grid reliability — the region's #1 mandate

SIGNAL

Output running 6.2% below the 30-day average, heat-rate drift +3.1% vs. commissioning spec.

INSIGHT

Matches a compressor-fouling pattern from 11 months of fleet history — not an immediate reliability risk, but worth inspecting before the next planned outage.

ASK

Schedule a borescope inspection before the next planned outage, not after.

Source: Unit 4 SCADA telemetry, trailing 30 days

Regional Anomaly — Balancing Authority 2

MOVES ANOMALY RESPONSE TIME Close the two-person bottleneck on anomaly interpretation

SIGNAL

Frequency deviation flagged at 2:14 AM, 90 seconds from ingest to explanation.

INSIGHT

Matches a known demand-ramp pattern tied to the region's morning industrial startup — not a grid-stability event.

ASK

Confirm the explanation before shift change so the pattern is logged for next week's forecast.

Source: Balancing Authority 2 EIA feed, 2:00–2:30 AM

Unit 3 — Startup-Cycle Count

MOVES COMPLIANCE FINDINGS Protect grid reliability — the region's #1 mandate

SIGNAL

Startup-cycle count extracted at 71% confidence, below the 85% auto-log threshold.

INSIGHT

Low-confidence extractions are exactly the case the threshold exists for — auto-logging this one risks a mis-recorded maintenance interval.

ASK

Route to engineering for a manual check before adjusting the maintenance interval.

Source: Unit 3 SCADA log, page 1 of startup report

NERC Reporting — Region 2

MOVES ANOMALIES EXPLAINED Stay ahead of NERC compliance exposure

SIGNAL

41 anomalies explained this week, 96% above the 85% auto-log confidence threshold.

INSIGHT

Explained-vs-flagged rate has climbed every week since go-live — the model is absorbing operator corrections, not just running static rules.

ASK

No action — cite this week's rate in the quarterly compliance review as evidence of the improvement trend.

Source: Region 2 anomaly log, trailing 7 days

Everything monitored, at a glance

Unit 2

Combined-cycle generation · Nominal

On target

Unit 3

Startup-cycle tracking · +2 vs. plan

Watch

Unit 4

Output & heat-rate · -6.2% output

Action needed

BA Region 2

Frequency deviation · 90 sec response

On target

Front-Office Signals

The report doesn't stop at the floor — same daily cadence, further up the business.

Regulatory filing backlog

0 open items

Inside normal range.

Demand-response contract utilization

12% of capacity

Slightly below plan — flagged for the commercial team, not urgent.

Maintenance-budget variance

+1.4% vs. plan

Trending flat month over month.

How This Compares

Metric This operation Peer benchmark Source
Anomaly response time 90 sec 6.5 min NERC regional reliability median
Generation availability 97.8% 95.2% EIA fleet-wide benchmark

Recommended Actions Today

Shift Supervisor Confirm or escalate the Unit 4 output-deviation finding
Before 7:00 AM handoff
Engineering Manual check on the low-confidence Unit 3 startup-cycle count
Before adjusting maintenance interval
Maintenance Schedule borescope inspection for Unit 4
Before next planned outage
Commercial Review demand-response contract utilization against plan
This week

Every line above cites its source — a specific feed, log, or benchmark table, not a summary of a summary. If we can't show where a number came from, we consider that a bug.

CHAPTER 04 OF 5

UP NEXT · RUN & IMPROVE

See the before-and-after numbers — and what this really changed for the business.

Continue to Run & Improve